This job aid is designed to assist the CSR in determining the use of Terms 23 (Pendg Xchge Special Terms) on Replacements, Credits and RAs. 


#

3 Criteria

***If all 3 criteria are met, use terms 23 for the Replacement order AND the CM/RA

 

 

 

1

 

 

JPP or shipper Error

 

 

2

 

 

We are sending a replacement order

 

 

 

3

 

 

The amount of the replacement item(s) matches the amount of the original item(s).